Client: MEC Construction Carried out installation of 100mm up to 750mm foul and storm pipework up to 4m deep. Installed all manholes, and carried out air tests. Once completed we cut and capped roadways above.
Client: Sanctus We installed a new 6.5m deep manhole onto an existing combined sewer in the centre of a cross roads in a highly built up area in Bristol. The work was carried out from road level by using a 21t excavator with 3m extended clamshell grab. Before excavation commenced, we fitted a vacuum attachment to a 21T machine to…
Client: Sanctus Onyx Civils were contracted by Sanctus to supply and install a new storm and foul drainage system using the German made Funke thick-walled pipes, 150mm to 600mm diameter with varying depths of 1.5m to 3.5m. All manholes constructed were of the CPM Perfect Manhole system. This enabled us to deliver in a completely sealed system, in a timely…